Industrial

Stuart

Stuart

We constructed a plant which fabricates portable devices used to transform water into hydrogen. The 5,125 m² building includes a main industrial section as well as 860 m2 of office space spanning over two floors.

While the mandate was carried out in winter, the methods used allowed us to reduce the project timetable by 15 per cent with respect to the initial schedule estimates without exceeding budget projections.

Stuartl
Stuart
Stuart

Back Next